Engineering Intelligence for Product Teams

See what's moving,
what's stuck, and why.

Progress plugs into the tools your team already uses and turns that activity into plain-English answers — from what shipped this week to why a launch slipped. Technical or not, everyone gets the insight that matters.

Progress fills in your last two weeks of data the moment you connect. No blank first day.
https://seeprogress.ai/progress
Progress

Connected to the tools your team already uses


Half your morning is gone before you know what's happening.

Your morning, before Progress

Updates live in five different tools.

You piece the picture together yourself.

That's the cost of "staying in the loop."

Progress changes that.

Your daily life with Progress

Open Progress, move on with your day.


Founders who stopped guessing.

Real teams using Progress to see their work clearly — in their words.

It's the first thing I open. Two minutes and I know what shipped overnight and what needs me today... no scrolling through Slack and Linear to piece it together. No need to ping the team for updates.

Matt Pattoli

Matt Pattoli

Founder, TrySight.ai

I can finally see how marketing and dev are tracking together without pinging anyone. The cross-team picture used to take me half a dozen DMs, now it's just there.

Brad Smeltz

Brad Smeltz

Founder, GeniusPet.com

On a greenfield build there's a hundred moving parts. Progress gives me the one view that tells me what's actually done versus what's just in motion without digging.

Garrett Woodworth

Garrett Woodworth

Founder, SwingPath.ai


Why Progress exists
...and who built it

The problem was real. So I built the fix.

John Shipp

Built from the trenches

I built Progress to solve a problem I kept running into while leading and supporting product teams.

Like a lot of founders and product leaders, I was spending too much of my day trying to answer one simple question:

What's actually happening?

I'm John Shipp, a fractional CTO who never stopped building.

That meant scrolling Slack, cross-referencing Linear, clicking through pull requests, and checking deployments just to reconstruct context. Even with solid SOPs in place, the signal was scattered, and staying oriented took more effort than it should have.

Progress exists to fix that.


The right signal at your speed.

Choose the frequency that fits how you lead.

Monthly Annual Save 10%

"I want regular check-ins so I don't drift."

Pulse

$179 /month

Up to 2 scheduled updates per day, any time

Designed for leaders who prefer to sync at natural breakpoints.

  • Everything you need to start:
  • 10,000 AI credits/month
  • Up to 25 people tracked
  • 21-day context memory
  • Meeting recording & notes included
  • Configurable Slack & email alerts
Recommended

"I need awareness while decisions are still reversible."

Flow

$349 /month

Up to 4 scheduled updates per day, any time

High-frequency clarity for teams that move fast.

  • Everything in Pulse, plus:
  • 20,000 AI credits/month
  • Up to 35 people tracked
  • 60-day context memory
  • High-priority queue

"I want complete visibility, without waiting"

Signal

$599 /month

Up to 6 scheduled updates per day, any time

For leaders who need to see it all, as it happens, without doubt.

  • Everything in Flow, plus:
  • 35,000 AI credits/month
  • Up to 50 people tracked
  • 90-day context memory
  • SMS, email, and Slack alerts
  • First-in-line priority queue

Swipe to see all plans


No performance scoring.
No surveillance.
Just signal.

Progress is built to create clarity, not pressure. It makes sense of what your team is already doing, and shows you what's moving, what's stuck, and what needs you. No grading, no ranking. It never posts, shares, or notifies on its own. That's your call.


Start your 7-day free trial

Try it on this week's work.

Connect your tools and Progress fills in your last two weeks, so you see what's moving and what's stuck from day one.

7-day free trial · cancel anytime