From the team building Progress

The Progress blog

Insights on shipping software, team visibility, and getting clarity across all your tools.

Engineering Team Health Metrics: What They Are, Why They Matter, and How to Use Them
16 min read

Engineering Team Health Metrics: What They Are, Why They Matter, and How to Use Them

Engineering Team Health Metrics are leading indicators that help technical leaders see beyond output data — revealing whether work is flowing, whether the team is sustaining a healthy pace, and whether risks are accumulating before they surface in delivery. This guide explains what these metrics are, why they matter more than traditional output tracking, and how to put them to work.

Read more
How to Set Up Automated Sprint Health Reports: A Step-by-Step Guide for Engineering Leaders
15 min read

How to Set Up Automated Sprint Health Reports: A Step-by-Step Guide for Engineering Leaders

Automated Sprint Health Reports eliminate the manual effort of pulling data from tools like Jira, Linear, and GitHub, replacing stale slide decks with continuously updated signals on stalled work, deployment risk, and team momentum. This step-by-step guide shows engineering leaders exactly how to define sprint health, connect existing tools, and build a low-maintenance reporting system that drives real decisions.

Read more
Work Stream Health Monitoring: What It Is and Why Your Engineering Team Needs It
12 min read

Work Stream Health Monitoring: What It Is and Why Your Engineering Team Needs It

Work stream health monitoring is the practice of creating a continuous visibility layer across engineering initiatives so that risk, blockers, and stalls are surfaced in real time rather than discovered at retrospectives. For lean startup dev teams with fewer people and fewer formal checkpoints, it's the difference between catching a stalled feature early and explaining a missed deadline after the fact.

Read more
9 Best Developer Team Insights Platforms in 2026
15 min read

9 Best Developer Team Insights Platforms in 2026

A developer team insights platform bridges the gap between what engineering leaders assume is happening and what the data actually shows — surfacing stalled PRs, burnout signals, and risky deployments before they become costly. This guide evaluates nine leading platforms in 2026, helping CTOs and engineering managers choose the right tool based on depth of insight, ease of integration, and actionable decision support.

Read more
Engineering Leadership Reporting Automation: A Step-by-Step Guide for Dev Teams
17 min read

Engineering Leadership Reporting Automation: A Step-by-Step Guide for Dev Teams

Engineering Leadership Reporting Automation replaces the manual, hours-long process of piecing together data from GitHub, Linear, and Slack with pre-computed signals that surface risk, stalls, and momentum in real time. This step-by-step guide walks startup dev teams and engineering managers through building an automated reporting stack that informs decisions instead of just describing the past.

Read more

Start your 7-day free trial

Try it on this week's work.

Connect your tools and Progress fills in your last two weeks, so you see what's moving and what's stuck from day one.

7-day free trial · cancel anytime