From the team building Progress

The Progress blog

Insights on shipping software, team visibility, and getting clarity across all your tools.

Engineering Team Health Indicators: What They Are, Why They Matter, and How to Track Them
16 min read

Engineering Team Health Indicators: What They Are, Why They Matter, and How to Track Them

Engineering team health indicators move beyond activity metrics like velocity and commit graphs to measure whether a team is operating sustainably, retaining knowledge, and heading in the right direction. This guide explains what these indicators are, why they matter more than standard productivity data, and how engineering leaders can start tracking them effectively.

Read more
How to Run a Development Team Momentum Analysis: A Step-by-Step Guide
16 min read

How to Run a Development Team Momentum Analysis: A Step-by-Step Guide

Development team momentum analysis is a systematic, data-grounded practice that helps engineering leaders determine whether their team's output is accelerating, plateauing, or stalling — before delivery timelines slip or burnout sets in. This step-by-step guide walks technical leaders through six practical steps to read work-flow signals, distinguish temporary dips from structural problems, and act on emerging issues with confidence.

Read more
How to Improve Engineering Team Transparency: A Step-by-Step Guide for Technical Leaders
15 min read

How to Improve Engineering Team Transparency: A Step-by-Step Guide for Technical Leaders

Engineering teams often operate as a black box, leaving technical leaders guessing about progress, risk, and delivery health. This step-by-step guide shows CTOs, engineering managers, and founders how to improve engineering team transparency by turning existing tool signals — from GitHub, Linear, and similar platforms — into a working visibility system that surfaces problems early and keeps stakeholders informed without burdening engineers with extra reporting.

Read more
Engineering Risk Detection: How to Spot Problems Before They Become Crises
13 min read

Engineering Risk Detection: How to Spot Problems Before They Become Crises

Engineering risk detection is the practice of identifying the early warning signals — stalled PRs, hidden blockers, quiet bottlenecks — that predict engineering failures before they escalate into missed releases or full-blown crises. This article breaks down why risk is so hard to spot in real time, which signals actually matter, and how modern tooling helps teams shift from reactive scrambling to proactive, data-driven oversight.

Read more

Start your 7-day free trial

Try it on this week's work.

Connect your tools and Progress fills in your last two weeks, so you see what's moving and what's stuck from day one.

7-day free trial · cancel anytime